Insurance for Massachusetts home builders and builder-developers, starting where a build starts: with the house itself. Builders risk covers the structure from the first stake in the ground to the closing, and most of what goes wrong in builder insurance is a builders risk detail: bound late, written for the wrong value, or expired three weeks before the certificate of occupancy. Behind it sits the rest of the program: liability and completed operations that answer for a house for six years after closing, workers' comp on WCRIBMA class 5645 at $4.60, and the subcontractor certificate system your audit will test.

Framers building the floor and wall framing of a new Massachusetts home, seen from inside the structure
Framing stage on a residential build. This is the point where builders risk, comp classification, and subcontractor certificates all meet.
$4.60Class 5645 manual rate per $100 of payroll, residential dwellings up to 3 stories, WCRIBMA, eff. July 1, 2024
6 yearsMassachusetts statute of repose for construction claims, M.G.L. c. 260, § 2B
1/3Maximum deposit under the HIC law before work begins, for work the law covers
$25,000Guaranty Fund cap per eligible homeowner claim, for unpaid judgments against registered contractors

The coverages that earn their premium

A new home is exposed the whole way through: materials on a bare lot, a frame standing open to weather, subs rotating through the site, and a finished house whose work can still be questioned years after the closing. Each of those exposures has a policy part that answers it, and the gaps usually live in the assumptions: that liability pays to rebuild a burned frame, or that the builders risk someone bought is written for the finished value.

Builders risk

Property insurance on the work itself, also sold as course of construction coverage. Your general liability policy does not pay to rebuild a house that burns mid-frame, and a homeowners policy does not exist yet. Builders risk fills exactly that window: the structure, materials on site, in transit, and stored off site, against fire, theft, vandalism, wind, and collapse.

The value question: It is written for the full completed value of the home, not the amount spent so far, and it has to be in place before work starts and materials land on the lot.

Builders risk, in full ↓

General liability & completed operations

Covers bodily injury and property damage you cause to other people: a visitor hurt on the site, a delivery that takes out the neighbor's fence, a burst line that floods the finished house next door. The part that earns its premium is completed operations, the coverage that responds after the keys change hands, when a defect surfaces in year three.

The long clock: Massachusetts gives construction defect claims up to six years under the statute of repose, M.G.L. c. 260, § 2B. Your liability program has to be built for that horizon.

Liability & completed operations →

Workers' compensation

Pays medical bills and lost wages for your own crews, and it is required by law from the first employee under M.G.L. c. 152, § 25A. Most home builders whose crews build houses are governed by WCRIBMA class 5645 at $4.60 per $100 of payroll. Supervision, finish carpentry, concrete, and clerical each carry their own rate when the records support the split.

Example loss: A framer falls from a top plate and is out for a season. The claim follows your experience mod for three years, which is why claims management is a pricing tool, not paperwork.

Comp codes & rates →

Tools & equipment

Inland marine covers the gear that does the building: excavators and loaders if you run your own site work, trailers, compressors, lifts, and the hand and power tools that walk off open sites. Builders risk covers materials that will become part of the house. It generally does not cover the machines and tools doing the building.

Example loss: A trailer cut open overnight takes a framing crew's saws, nailers, and compressor. A current equipment schedule with serial numbers is what makes that claim a check instead of an argument.

Auto, tools & equipment →

Commercial auto

Pickups and dump trucks titled to the company, material runs, and employees driving their own vehicles on your errands are three different exposures wearing the same clothes. Commercial auto handles the company vehicles. The employee's personal truck on a lumber run is the gap builders miss, and hired and non-owned auto is the part of the policy that answers it.

Watch for: Trailers over certain weights and uses need to be scheduled rather than assumed covered, and every regular driver should be listed and checked.

Auto, tools & equipment →

Umbrella / excess liability

Sits over your liability and auto and responds when an underlying limit is exhausted. On a residential site the severe claim is rarely the routine one. It is the fall, the collapse, the multi-car accident on a material run. Builders carrying six years of completed operations exposure should at least see the price of the layer above their primary limits.

Contract note: Lenders, developers, and buyers' attorneys increasingly ask for umbrella limits in the contract documents. Price it before you sign, not after.

What it costs →

Builders risk: ground breaking to closing

This is the line most "builders insurance" searches are actually about, and the one with the most ways to buy it wrong. The details that matter are who buys it, when it starts, what value it is written for, and how it ends.

Who buys it, and when

  • Builder, buyer, and lender can each have an interest in the same structure. The contract should say who carries the policy, and every party with money in the project should be named or listed as their interest appears.
  • Lenders on a construction loan usually require it and set the terms: full completed value, the lender named as mortgagee, in place before the draws start. The requirements guide covers the lender angle in full.
  • Put it in place before work starts and before materials land on the lot. A policy bound after the frame is up leaves the earliest, most exposed weeks uninsured.
  • Write it for the full completed value of the home, not the amount spent so far. A fire in month five is priced against what it costs to put the whole house back.

One project at a time, or a reporting form

  • Single-project policies fit a custom builder with one or two starts a year: one policy per house, written for that house's completed value and expected duration.
  • A reporting form fits a builder with a steady flow of starts: one policy, each new start reported as it breaks ground, premium adjusted on reported values. It is the efficient route, with one hard rule: an unreported start is an uninsured start.
  • Check what the form includes: materials in transit and stored off site, scaffolding and temporary structures, and whether flood or earth movement is excluded. In Massachusetts both usually need to be added on purpose if you want them.

The soft cost problem

A covered loss late in a build costs more than the repairs. Interest on the construction loan keeps running, permits and architectural work may need to be redone, and a buyer may walk. Those are soft costs, and they are only covered if the policy includes them. If a closing date is financing a land payment or a crew schedule, ask about soft costs and delay coverage before the loss, not after.

Closing and the handoff

Builders risk ends when the home is finished and ready for occupancy, when the buyer takes possession, or when the policy term runs out, whichever comes first. The homeowners or dwelling policy has to start at that same moment. The most common gap we see is a policy that expired on the scheduled completion date while the build ran three weeks long. Extensions are cheap and easy if you ask while the policy is still alive, and hard once it has ended.

What builders risk does not do

It does not cover injuries, damage to a neighbor's property, faulty workmanship itself, or the tools in your trailer. Those belong to liability, workers' comp, and equipment coverage. It also will not pay the cost to redo your own defective work, only resulting damage the form covers, which is a distinction worth reading once in your own policy. On additions and renovations to an existing home, the matching tool is usually an installation floater, not builders risk; the auto and tools guide draws that line.

Guides

Written for Massachusetts home builders, with the statute, the regulation, or the class code behind every number.

Questions Massachusetts builders actually ask us

Who buys builders risk, the builder or the buyer? When does it have to be in place? Does the HIC law touch a new custom home, and how long can a buyer come back at you over a house you built? We collected the straight answers, with the statute or the circular behind each one, on one page.

Read the builder insurance FAQ →

Questions we hear from Massachusetts builders

What workers' comp class code governs a Massachusetts home builder?

For most builders whose own crews build detached homes of three stories or less, the governing class is 5645 at a manual rate of $4.60 per $100 of payroll, WCRIBMA, effective July 1, 2024. Supervisors doing no hands-on work may be 5606 at $0.80, interior trim and cabinets 5437 at $2.50, and clerical 8810 at $0.04. Your carrier assigns classes from the work each person actually does, and payroll splits need records to back them up. The workers' comp guide has the full table and estimator.

When does builders risk start and end?

It should be bound before work starts and materials arrive, written for the full completed value. It ends at the earliest of completion and readiness for occupancy, the buyer taking possession at closing, or the policy expiration. Plan the homeowners policy to start the same day, and extend the builders risk if the build runs long, while it is still in force.

Who buys builders risk, the builder or the buyer?

Either can, and that is exactly why the contract has to say. On a spec home the builder usually carries it. On a custom home where the buyer owns the lot and holds the construction loan, the buyer or the lender's terms may put it on the buyer. What matters is that one policy, written for the full completed value, names every party with money in the project. The requirements guide covers how lenders set this.

How long can I be sued over a house I built?

The Massachusetts statute of repose, M.G.L. c. 260, § 2B, bars tort claims for construction deficiencies more than six years after the improvement is opened to use or substantially completed and taken for occupancy, and claims must also be brought within three years of accruing. Contract and warranty claims have their own rules. Either way, it argues for keeping completed operations coverage in force well past the last closing.

Does the HIC law apply to a new custom home?

Generally no. The Office of Consumer Affairs publishes that the HIC law covers existing, owner-occupied homes of one to four units, and does not cover new construction. It does apply to additions and renovations on existing homes, with registration, written contracts over $1,000, and the one-third deposit cap. Many builders carry both kinds of work, so both regimes can apply to one company. See the requirements guide.

What if a sub hands me an expired certificate at audit?

For the uncovered period, the carrier can treat payments to that sub as your payroll and charge at the rate for their work. At the 5645 rate, $50,000 of uninsured framing payments adds $2,300. Collect current certificates before work starts, log expiration dates, and renew them during the job, not after it. The system is in the subcontractor guide.

How do I get out of the assigned risk pool?

Build the record a voluntary carrier wants: clean, on-time audits, certificates for every sub, prompt claim reporting, a written safety routine that actually happens, and a complete submission sent early. Then have your agent shop it. The pool takes employers rejected by two insurers, so the way out is becoming an account two insurers would not reject. The workers' comp guide lays out the path.

Get a quote from Segreve & Hall

Three ways in, all reaching the same agency in Andover. Bring your current declarations if you have them, the projects you have underway and starting this year with their completed values, your payroll split between your own crews and your subs, and any builders risk or certificate requirements a lender, buyer, or town is asking you to meet. No coverage can be bound by voicemail, email, or a form submission alone; binding requires a conversation and confirmation, which is how it should work.